Blog Archive

Tuesday, 30 July 2013

Nuclear fire at Fukushima 2nd burn

[snip public awareness licence/ google translate]

Now! ! Fukushima Daiichi nuclear power plant emergency!

I think better to Kanto region escape preparation is good. Emergency 20130728 Fukuichi
Situation has worsened Fukushima Daiichi nuclear power plant July 28 2013.
Information nuclear fuel that has been burning has entered.
Please do not trust government, the Masugomi.

Workers to work in the first nuclear power plant is a subcontractor of the subcontractor subcontract.
Probably should have been allowed to pledge that you do not divulge information to third parties in the contract, but the information is leaking.
Nuisance because it takes, I'll lie down in the information source.

Please also note wind direction forecast of Switzerland Japan Meteorological Agency.
http://www.meteocentrale.ch/ja/weather/weather-extra/weather-in-japan.html

Radioactivity from the Fukushima Daiichi nuclear power plant is a 5 sievert per hour.
Radioactivity of Kitaibaraki is 7 per hour micro sievert.
1 Sievert 1000 mSv. 1 mSv 1000 micro sievert.
Therefore, it will be 7 × 24 × 365 = 61320 = 61 millisieverts If you bathe one year 7 micro Sv / hour.

It is 61 times indeed public exposure reference value because the Japanese 1 mSv.(Reprinted article)

Please look well to the minute surrounded by a red line on the image.
Emergency 3 of 20,130,728 Fukuichi

According to the leak of TEPCO officials, current, Unit 4 and Unit 3 and Unit 2 of the Fukushima Daiichi nuclear power plant, further, is that the site and its surrounding facilities, nuclear fuel and are beginning to burn.

Portion enclosed by the red line, is the water injection crane.

It was seen immediately after the 311, but it was the appearance of two and a half years.
I have cool the nuclear fuel burning over the pounding water.
I think that's drop in the bucket.
It seems to request a call out to the fire brigade, but it is a pattern that is denied.

[end snip]

Post a Comment